Project Details

Completed:

2007

Project Cost:

$26,300,000

This project included third party mechanical and electrical systems commissioning services associated with the construction of the new three story, 98,900 SF Rockville Library.

Systems Commissioned included:

  • Central Chiller Plant
  • Condenser Water System
  • Heat Pump Units
  • Condensing Boiler System
  • HVAC Units
  • Variable Air Volume System
  • Energy Management System
  • Shaft (Elevator) Pressurization Systems
  • Indoor Environmental Testing/Monitor
  • Emergency Generators and Emergency Distribution Systems
  • Switchboards
  • Distribution Transformers
  • Distribution Panelboards
  • Automatic Transfer Switch
  • Lighting and Lighting Control
  • Fire Alarm
  • Telecommunications
  • Sound Systems
  • Television Distribution

Commissioning Services include the following:

  • Shop Drawing Review and Approval
  • Construction Coordination and Progress Meetings.
  • Validation of proper and thorough installation of Division 15 and 16 systems and equipment.
  • Mechanical systems balancing verification.
  • Functional Performance Testing of individual mechanical and electrical systems and equipment (including performance verification)
  • Functional Performance Testing of EMS and control sequences.
  • Documentation of all tests, procedures, and installations.
  • Coordination and documentation of training.
  • Documentation of operation and maintenance procedures.
  • Sequencing of HVAC and electrical systems commissioning with other work.