Shepherd University

Red Pump Elementary

ed-pump1-653×390
pump2-653×390
pump3-653×390
pump4-653×390
pump5-653×390
pump6-653×390
pump7-653×390

Project Details

Cost:

$22,400,000

Size:

100,000 SF

This project includes mechanical and electrical design for a new 100,000 SF elementary school, designed to accommodate 676 students in Harford County, Maryland.

Our Mechanical/Electrical/Plumbing Design included the following systems:

  • High efficiency air cooled chillers.
  • Gas fired high efficiency condensing boilers.
  • Gas fired domestic hot water heaters.
  • Four (4) pipe variable volume central heating and chilled water distribution piping system.
  • Multiple central station air handling units.
  • Variable air volume air distribution system.
  • Energy recovery system for classroom make-up air.
  • Energy management control system, connected to the County’s Central Command Center.
  • Electrical distribution system; 3,000 Amp service.
  • Telecommunication and data systems
  • PA System Wiring and connections to phone handsets.
  • Public address and intercom systems
  • Emergency generator.
  • Fire alarm and security systems.

Leave a Reply

Your email address will not be published. Required fields are marked *